Skip to content
Metro Sun Daily

Metro Sun Daily

REAL NEWS * REAL TIME

  • Front Page
  • Home
  • Nation
  • Metro
  • Regions
  • Global
  • Feature
  • Entertainment
  • Opinion
  • Business
  • Sports
  • OFW
  • VP Sara Impeachment
  • Nation

Metro Manila subway construction to continue under incoming Marcos admin

By Noel Lontoc
admin May 31, 2022

WITH all contracts and funding already secured into the new administration of president-elect Ferdinand ‘Bongbong’ Marcos Jr., outgoing Transportation Secretary Arthur Tugade has assured stakeholders that the construction of the ₱488-billion Metro Manila subway will continue until completed in 2027.

This was disclosed by Tugade in his report during the ‘Duterte Legacy Summit’ in Pasay City, where the transportation chief said the construction of the ambitious subway will happen on the first or second week of June, which will commence once the tunnel boring machine is set in place.

“In fact, the . . . transportation department will perform an activity to convince the people of the Philippines (this) are real at totoo,” he pointed out in reference to the lowering of the tunnel boring machine. Prior to Tugade’s report, the Department of Transportation (DoTr) had flaunted the speedy progress of the multibillion- peso Metro Manila Subway PH, which us being undertaken through a 253 billion yen (₱112.9-B) contract signed by Japan. “Most of the contracts involved in the construction of the subway are already awarded.

In fact many have started. Hindi na po matitigil ‘yan,” Tugade cited.

The transportation secretary undescored that the funds allocated for the project have already been prepositioned through loans agreed by the Department of Finance (DoF) and the Japanese government, while the right of way have already been started.

“Kung mayroon nang pondo, kung gawa na ang kontrata ng right of way, sabihin mo sa akin . . . paano hihinto ‘yan? Tuluy-na-tuloy ang subway,” he concluded.

Tags: marcos admin Metro Manila subway

Post navigation

Previous BRP Panglao idineploy para sa survivors ng vessel collision
Next BSP orders removal of E-Sabong from Apps of supervised entities

Related Stories

Madriaga fills ‘missing link’ in confidential funds trail — Chair Chua
  • Nation

Madriaga fills ‘missing link’ in confidential funds trail — Chair Chua

Swift deportation, full disclosure demanded after Zaldy Co’s arrest
  • Nation

Swift deportation, full disclosure demanded after Zaldy Co’s arrest

Chair Chua files bill to restore fuel price regulation: Ibalik natin ang power ng gobyerno
  • Nation

Chair Chua files bill to restore fuel price regulation: Ibalik natin ang power ng gobyerno

House of Representatives
APRIL 14, 2026
ODDNEWS

  • General in Hot Water: Napolcom cites P70k shoes as grounds for charges
  • Christmas Tragedy: Italian man chokes to death on panettone during family reunion
  • Japanese Woman Weds AI: The future of relationships?
  • A Single Dad’s Desperate Act: Police Chief’s Kindness Saves the Day
  • Security guard returns lost P1.5M bracelet
  • Sole survivor of Air India crash recounts escape

Source: USD/PHP @ Sat, 18 Apr.

Weather

Manila
Current weather
-º
Sunrise-
Sunset-
-
-
Forecast
Rain chance-
-
-
Forecast
Rain chance-
-
-
Forecast
Rain chance-
Manila weather

Latest Comments

  1. 나루토카지노 on Fuel prices poised for further surge next week: diesel P170/liter; gasoline P120/liter
  2. Fcb88 Uy Tín on Former DPWH usec Cabral found unresponsive near Kennon road

  • Front Page
  • Home
  • About Us
  • Donation
  • Privacy Policy
  • Contact
  • Facebook
  • Instagram
©2026 MetroSunDaily. All rights reserved. | DarkNews by AF themes.